mirror of
https://github.com/inventree/InvenTree.git
synced 2026-11-24 16:57:30 +00:00
Build output serial number docs (#12486)
* Remove serial number restriction when creating build outputs * Updated docs * additional docs
This commit is contained in:
1 parent
6302748ec8
commit
45f3810a8b
7 files changed
+64
-12
No files matched your search
@@ -8,7 +8,9 @@ Denoting a part as *Trackable* changes the way that [stock items](../stock/index
|
||||
|
||||
For many parts in an InvenTree database, simply tracking current stock levels (and locations) is sufficient. However, some parts require more extensive tracking than simple stock level knowledge.
|
||||
|
||||
Any stock item associated with a trackable part *must* have either a batch number or a serial number. This includes stock created manually or via an internal process (such as a [Purchase Order](../purchasing/purchase_order.md) or a [Build Order](../manufacturing/build.md)).
|
||||
Generally, a stock item associated with a trackable part should have either a batch number or a serial number. This includes stock created manually or via an internal process (such as a [Purchase Order](../purchasing/purchase_order.md) or a [Build Order](../manufacturing/build.md)).
|
||||
|
||||
However, this is not strictly enforced when creating a [build output](../manufacturing/output.md#create-build-output) - see [below](#build-orders) for further information.
|
||||
|
||||
## Assign Serial Numbers
|
||||
|
||||
@@ -35,3 +37,12 @@ For example:
|
||||
## Build Orders
|
||||
|
||||
[Build orders](../manufacturing/build.md) have some extra requirements when either building a trackable part, or using parts in the Bill of Materials which are themselves trackable.
|
||||
|
||||
### Build Outputs Without Serial Numbers
|
||||
|
||||
When [creating a build output](../manufacturing/output.md#create-build-output) for a trackable part, serial numbers are *not* required at the point of creation. This allows a batch quantity of build outputs to be created up-front, and serialized at some later stage - for example, after receiving a batch of unserialized units against an [external build order](../manufacturing/external.md).
|
||||
|
||||
If serial numbers are not provided, a single build output is created with the specified quantity, rather than one output per unit. This output can subsequently be assigned [serial numbers](#assign-serial-numbers), or split into individual serialized units, before it is completed.
|
||||
|
||||
!!! note "Tracked BOM Items"
|
||||
If the Bill of Materials for the part being built contains *tracked* (trackable) sub-components, serial numbers are still required when creating build outputs, regardless of whether the assembled part itself is trackable. This is necessary so that each tracked sub-component can be allocated against a specific build output. Refer to the [build allocation documentation](../manufacturing/allocate.md#tracked-build-outputs) for further information.
|
||||
Reference in new issue
Block a user